-
Project Priorities
-
Production Bay 2
LEFT –
Status: Open
RIGHT –
Status: Open
-
Production Bay 3
LEFT –
Status: Open
RIGHT – SMD Pre-Build
Status: Build
-
Production Bay 4
LEFT – Constant Pre-Build – GICC
Status: In Progress
RIGHT – Constant Pre-Build – GSOC & CSOC
Status: In Progress
-
Production Bay 5
LEFT – PR 1384 – Rack Build – Alpha Testing
Status: Waiting on Silent Rack
RIGHT – Constant Pre-Build –
Status: Hold
-
Production Bay 6
Stryke Lightning Build
Status: Pulling product to the floor
